EWP-EDF One Jaffa Port Wave Energy Pilot Project
Sector: Power Generation (CCGT) • Location: Tel Aviv-Yafo, Israel
Source: Eco Wave Power
The first wave energy installation in Israel to supply electricity to the national grid, demonstrating stable performance and reliability under real sea conditions, including record production levels during peak wave events. It serves as a model for grid integration, durability, and cost efficiency, and supports future commercial-scale deployments and AI-driven optimization tools.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Commercial
- Location
- Tel Aviv-Yafo, Israel
- Updated
- 22 Jul 2026
- Source
- Eco Wave Power
ConstructChat
Ask ConstructChat about EWP-EDF One Jaffa Port Wave Energy Pilot Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | operational |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The first wave energy installation in Israel to supply electricity to the national grid, demonstrating stable performance and reliability under real sea conditions, including record production levels during peak wave events. It serves as a model for grid integration, durability, and cost efficiency, and supports future commercial-scale deployments and AI-driven optimization tools. |
Original sector | Energy |
Location
Country | Israel |
City | Tel Aviv-Yafo |
Source
Source | Eco Wave Power |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
