logo
ProjectUnder Construction

Exit 17 Project in Colchester

The status, timeline and source of this project. A free account opens every field.

Source: Burlington Free Press

The Exit 17 project in Colchester requires temporary lane reductions and shifts on U.S. 7 and U.S. 2 between 6 a.m. and 8 p.m., with two-way traffic maintained. Work is scheduled for weekdays during both nighttime and daytime hours. Completion is expected by summer 2026.

Status
Under Construction
Sector
Road
Location
Colchester, Vermont, United States of America
Updated
22 Jul 2026
Source
Burlington Free Press

ConstructChat

Ask ConstructChat about Exit 17 Project in Colchester

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Exit 17 Project in Colchester” is an infrastructure initiative in the Road sector, located in Colchester, Vermont, United States. Taiyo aggregates data on it from Burlington Free Press.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Exit 17 project in Colchester requires temporary lane reductions and shifts on U.S. 7 and U.S. 2 between 6 a.m. and 8 p.m., with two-way traffic maintained. Work is scheduled for weekdays during both nighttime and daytime hours. Completion is expected by summer 2026.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Vermont

City

Colchester

Source

Source

Burlington Free Press

URL

More Details

Record type

Project

Sector

Road

Article published date

2025-11-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project