EXP POWER PROGRAM II

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Principal features of the project are as follows: (A) completion of the existing El Colegio hydro plant, by the addition of three 50 MW units, to its final 300 MW capacity. Since the new units would utilize some facilities included in the first stage of the plant, the cost per kilowatt installed for this plant is $65. The unit cost for the total 300 MW installation would be about $158 per kilowatt

Status
Closed
Sector
Road, Water Supply and Storage, Power Generation (CCGT), Hydro, Government
Location
Colombia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about EXP POWER PROGRAM II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “EXP POWER PROGRAM II” is an infrastructure initiative in the Road sector, located in Colombia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Principal features of the project are as follows: (A) completion of the existing El Colegio hydro plant, by the addition of three 50 MW units, to its final 300 MW capacity. Since the new units would utilize some facilities included in the first stage of the plant, the cost per kilowatt installed for this plant is $65. The unit cost for the total 300 MW installation would be about $158 per kilowatt. (B) Construction of the Canoas hydro plant, with one 50 MW unit. In addition to generating power, this plant will control the supply of water for the rest of the hydro generating system which is built in a series on a 25 km stretch of the Bogota River. The cost of this installed capacity is estimated at about $245 per kilowatt. (C) Expansion and improvement of transmission and distribution system facilities scheduled during the period 1968-1970 required to market the power to be generated by the planned addition to capacity. This also includes extension of street lighting facilities.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Colombia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Power Generation (CCGT), Hydro, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project