logo

Expansion and Strengthening of Nicaragua's Electricity Transmission System

Sector: Power Generation (CCGT) • Location: Nicaragua

Source: Inter-American Development Bank (IADB)

Project
Closed

The general objective of the project is to promote an increase in the population¿s welfare by strengthening the transmission infrastructure in order to connect new clients, improve the quality of supply, and move forward on optimization of the regional infrastructure. The specific objectives of the program include: (i) ensuring the continuous supply of electricity in the areas benefitted by the ex

Project Information FAQ

Project Information

5 Q
The project “Expansion and Strengthening of Nicaragua's Electricity Transmission System” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Nicaragua. Taiyo aggregates data on it from Inter-American Development Bank (IADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The general objective of the project is to promote an increase in the population¿s welfare by strengthening the transmission infrastructure in order to connect new clients, improve the quality of supply, and move forward on optimization of the regional infrastructure. The specific objectives of the program include: (i) ensuring the continuous supply of electricity in the areas benefitted by the expansion of electricity coverage under the National Sustainable Electrification and Renewable Energy Program (PNESER); (ii) increasing load transmission capacity to meet electricity demand and carry the power generated in the expansion area under the PNESER program; and (iii) optimizing the load capacity of the regional transmission line on the segments located in Nicaragua.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data