logo

Expansion of the North-South Interconnection

Sector: Power Generation (CCGT) • Location: Brazil

Source: World Bank Group

Project
Active

The project comprises building and operating two 500Kv transmission lines that transport energy from Samambaia substation in the Federal District to Emborcacao and Itumbiara substations, in the border of the states of Goias and Minas Gerais. Samambaia-Emborcacao line has 285Km and the Samambaia-Itumbiara line has 296 Km. The company responsible for the project, Expansion, is a consortium composed

Project Information FAQ

Project Information

4 Q
The project “Expansion of the North-South Interconnection” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project comprises building and operating two 500Kv transmission lines that transport energy from Samambaia substation in the Federal District to Emborcacao and Itumbiara substations, in the border of the states of Goias and Minas Gerais. Samambaia-Emborcacao line has 285Km and the Samambaia-Itumbiara line has 296 Km. The company responsible for the project, Expansion, is a consortium composed by four private Spanish groups (Elecnor, Isolux and Abengoa and Cobra Group). ANEEL, the Brazilian independent regulatory agency for the electricity sector, offered through public bid the concession for the lines in 2000. The contract between ANEEL and Expansion was signed in December 2000 and it will be valid until December 2030. According to the contract, the lines should start operating within 28 months of signature. Expansion finished the construction before the deadline and was granted a early completion bonus of US$2.93 million (R$8.5 million) by ANEEL. The lines started operating in December 2002. The total project investment was US$191.2 (R$350 million), of which US$78.7 million (R$230million) was provided by Brazil’s National development Bank, BNDES and the remaining 30% were provided by the four sponsors. The BNDES loan should be paid in 12 years. The project comprising lines from Samambaia substation to Emborcacao and Itumbiara is considered an expansion of North-South interconnection line (Eletrobras), which integrated the two electric systems in the country, previously isolated from each other. The project was expected to add 600 MW of transmission capacity to the interconnected system. This link will become even more important when the North South interconnection II (Novatrans), a parallel line to the first north-south interconnection, is built. The interconnected system is expected have a reliable structure to transport to and from most Brazilian states 98% of the total energy produced in the country, reducing the risks of power shortages and increasing the efficiency of the system. In March 2010, the shareholding structure was modified when a Chinese state – owned company, SGID, acquired the shares of Isolux, Cobra and Elecnor, which represented 75% of the shares.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data