Expansion of the Operations Centre garage

Sector: Power Generation (CCGT) • Location: Quebec, Canada

Source: Infrastructure Canada

Project
Completed

The garage at the Operations Centre on Saint-Omer Street is at maximum capacity. However, in order to meet the orientation of the Strategic Plan, STLévis must be able, in the short term, to house additional buses in the Saint-Omer Street garage. The additional space would also increase the number of vehicles on reserve for maintenance, as the current reserve rate is very low. The project consists

Status
Closed
Sector
Power Generation (CCGT), Car parking, Automotive, Road
Location
Quebec, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Expansion of the Operations Centre garage

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Expansion of the Operations Centre garage” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Quebec, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The garage at the Operations Centre on Saint-Omer Street is at maximum capacity. However, in order to meet the orientation of the Strategic Plan, STLévis must be able, in the short term, to house additional buses in the Saint-Omer Street garage. The additional space would also increase the number of vehicles on reserve for maintenance, as the current reserve rate is very low. The project consists of expanding the garage by moving the back wall (to the east) for another row of eight buses. Steps completed: 1. Preliminary architectural sketch (2015) 2. Minor exemption (city of Lévis) (2015) 3. Technical opinion report (2016) Next steps in 2017-18: 1. Preparation of the architectural drawings and specifications 2. Application for construction permit 3. Subsidy application 4. Construction work With the cost savings achieved through this project, the STL wishes to add additional deliverables to the expansion of the Operation Center garage. It wants to upgrade certain electrical infrastructures and upgrade the fire system in the garage of the Operations Center. Following the expansion of the garage, project experts assessed that there was an increased fire risk as well as the interruption of the power supply due to higher demand as a result of the addition of equipment. They want to improve the electrical infrastructure and ensure that they meet the standards of the fire system

Original sector

Public Transit

Location

Country

Canada

State

Quebec

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Car parking, Automotive, Road

Article published date

2026-05-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project