Expansion of the Operations Centre garage
Sector: Power Generation (CCGT) • Location: Quebec, Canada
Source: Infrastructure Canada
The garage at the Operations Centre on Saint-Omer Street is at maximum capacity. However, in order to meet the orientation of the Strategic Plan, STLévis must be able, in the short term, to house additional buses in the Saint-Omer Street garage. The additional space would also increase the number of vehicles on reserve for maintenance, as the current reserve rate is very low. The project consists
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The garage at the Operations Centre on Saint-Omer Street is at maximum capacity. However, in order to meet the orientation of the Strategic Plan, STLévis must be able, in the short term, to house additional buses in the Saint-Omer Street garage. The additional space would also increase the number of vehicles on reserve for maintenance, as the current reserve rate is very low. The project consists of expanding the garage by moving the back wall (to the east) for another row of eight buses. Steps completed: 1. Preliminary architectural sketch (2015) 2. Minor exemption (city of Lévis) (2015) 3. Technical opinion report (2016) Next steps in 2017-18: 1. Preparation of the architectural drawings and specifications 2. Application for construction permit 3. Subsidy application 4. Construction work With the cost savings achieved through this project, the STL wishes to add additional deliverables to the expansion of the Operation Center garage. It wants to upgrade certain electrical infrastructures and upgrade the fire system in the garage of the Operations Center. Following the expansion of the garage, project experts assessed that there was an increased fire risk as well as the interruption of the power supply due to higher demand as a result of the addition of equipment. They want to improve the electrical infrastructure and ensure that they meet the standards of the fire system |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |