The garage at the Operations Centre on Saint-Omer Street is at maximum capacity. However, in order to meet the orientation of the Strategic Plan, STLévis must be able, in the short term, to house additional buses in the Saint-Omer Street garage. The additional space would also increase the number of vehicles on reserve for maintenance, as the current reserve rate is very low. The project consists
- Status
- Closed
- Sector
- Road, Power Generation (CCGT), Automotive, Car parking
- Location
- Quebec, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Expansion of the Operations Centre garage
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The garage at the Operations Centre on Saint-Omer Street is at maximum capacity. However, in order to meet the orientation of the Strategic Plan, STLévis must be able, in the short term, to house additional buses in the Saint-Omer Street garage. The additional space would also increase the number of vehicles on reserve for maintenance, as the current reserve rate is very low. The project consists of expanding the garage by moving the back wall (to the east) for another row of eight buses. Steps completed: 1. Preliminary architectural sketch (2015) 2. Minor exemption (city of Lévis) (2015) 3. Technical opinion report (2016) Next steps in 2017-18: 1. Preparation of the architectural drawings and specifications 2. Application for construction permit 3. Subsidy application 4. Construction work With the cost savings achieved through this project, the STL wishes to add additional deliverables to the expansion of the Operation Center garage. It wants to upgrade certain electrical infrastructures and upgrade the fire system in the garage of the Operations Center. Following the expansion of the garage, project experts assessed that there was an increased fire risk as well as the interruption of the power supply due to higher demand as a result of the addition of equipment. They want to improve the electrical infrastructure and ensure that they meet the standards of the fire system |
Original sector | Public Transit |
Location
Country | Canada |
State | Quebec |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Road, Power Generation (CCGT), Automotive, Car parking |
Article published date | 2026-04-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project