logo

EXPANSION PROJECT II

Sector: Water Supply and Storage • Location: Colombia

Source: World Bank Group

Project
Closed

The Second Bogota Power Expansion Project for Colombia will provide a loan of US $50 million to the Empresa de Energia Electrica de Bogota to finance the expansion of its power facilities. The Empresa is an autonomous municipally owned public utility that serves the capital city of Bogota. It is the only electric utility in the Bogota area. Currently, the Empresa does not have enough capacity to s

Project Information FAQ

Project Information

5 Q
The project “EXPANSION PROJECT II” is an infrastructure initiative in the Water Supply and Storage sector, located in Colombia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Second Bogota Power Expansion Project for Colombia will provide a loan of US $50 million to the Empresa de Energia Electrica de Bogota to finance the expansion of its power facilities. The Empresa is an autonomous municipally owned public utility that serves the capital city of Bogota. It is the only electric utility in the Bogota area. Currently, the Empresa does not have enough capacity to supply the power needs of consumers in the area. The project will resolve this problem by continuing the development of the Bogota River's hydropower potential. Its components are: 1) construction of the Colegio hydroelectric power plant with a capacity of 150 MW; 2) addition of a second 33 MW thermal unit at the Zipaquira thermal station; 3) completion of the Guatavita dam and storage reservoir to its final height; 4) installation of the Muna pump storage station; and 5) additions to the transmission and distribution facilities. These improvements will increase the power supply of the Empresa in order to meet consumer needs in the Bogota area.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data