Express- CIP or Public Project:1902/Gatchell
Sector: Water Supply and Storage • Location: San Diego, United States
Source: City of San Diego Development Permits
PENINSULA: Building Mechanical, Electrical and Plumbing permit for: New Water Purification Demonstration Facility named “Central Area Small-Scale Facility” Processed, Structures and Systems 2. ELEVATED STRUCTURAL SLABS ON PILE FOUNDATIONS (6,577 SQ. FT.) AND 3 MAT SLABS-ON-GROUND (3,443 SQ. FT.). ONE MAT SLAB WILL BE MODIFIED BY REMOVING (E) EQUIPMENT PADS, INFILLING A TRENCH AND ADDING TOPPING (
- Status
- Prospective
- Sector
- Water Supply and Storage, Nuclear, Chemical (Industrial), Road, Manufacturing (Industrial), Commercial
- Location
- San Diego, United States of America
- Updated
- 19 Nov 2026
- Source
- City of San Diego Development Permits
ConstructChat
Ask ConstructChat about Express- CIP or Public Project:1902/Gatchell
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | inspection followup |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | PENINSULA: Building Mechanical, Electrical and Plumbing permit for: New Water Purification Demonstration Facility named “Central Area Small-Scale Facility” Processed, Structures and Systems 2. ELEVATED STRUCTURAL SLABS ON PILE FOUNDATIONS (6,577 SQ. FT.) AND 3 MAT SLABS-ON-GROUND (3,443 SQ. FT.). ONE MAT SLAB WILL BE MODIFIED BY REMOVING (E) EQUIPMENT PADS, INFILLING A TRENCH AND ADDING TOPPING (1,860 SQ. FT.). NINETY SEVEN PIECES OF EQUIPMENT WILL BE ANCHORED. THERE ARE RETAINING WALLS TOTALING 134 LF FOR 3’-6” AND UNDER, 88 LF FOR 5’-6” AND UNDER AND 197 LF FOR 7’-6” AND UNDER. ADA Review B-21151 uploaded under applicant response to issues. DEFERRED APPROVALS 1. (1) PREMANUFACTURED ELECTRICAL ENCLOSURE INCLUDING HVAC 480 SQ. FT. 2. (3) PREMANUFACTURED CLOTH CANOPIES TOTALING 2,513 SQ. FT. 1. Process Facilities Includes A, Primary Influent and Primary Effluent feed pumps B, Blend Tank C, Biological nutrient removal (BNR) System D, Membrane Bio Reactor (MBR) System E, Ozone Treatment F, Biological Activated Carbon Filtration G, Membrane filtration H, Reverse Osmosis I, Ultraviolent / Advanced Oxidation Process 2. Support Systems Included A, Chemical Storage and Delivery Systems B, Electrical and Control 3. Perform Site Work Grading, New Pavement and Yard pipes. |
Original sector | Public Works/Utilities Bldg |
Budget |
Location
Country | United States of America (USA) |
City | San Diego |
Source
Source | City of San Diego Development Permits |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Nuclear, Chemical (Industrial), Road, Manufacturing (Industrial), Commercial |
Article published date | 2026-04-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States
- Shaw Air Force Base
- Kings Bay Naval Submarine Base
- Beaumont Refinery Expansion, Texas
- Dakota Prairie Refinery, Stark County, North Dakota
- Monkey Island LNG Terminal, Louisiana
- Bayou Bridge Pipeline Project, Louisiana
- Texas LNG’s New Liquefied Natural Gas Facility, Brownsville, Texas
- Trunkline LNG Lake Charles Terminal, Louisiana
