logo
ProjectInspection FollowupBP

Express- CIP or Public Project:1902/Gatchell

Sector: Water Supply and Storage • Location: San Diego, United States

Source: City of San Diego Development Permits

PENINSULA: Building Mechanical, Electrical and Plumbing permit for: New Water Purification Demonstration Facility named “Central Area Small-Scale Facility” Processed, Structures and Systems 2. ELEVATED STRUCTURAL SLABS ON PILE FOUNDATIONS (6,577 SQ. FT.) AND 3 MAT SLABS-ON-GROUND (3,443 SQ. FT.). ONE MAT SLAB WILL BE MODIFIED BY REMOVING (E) EQUIPMENT PADS, INFILLING A TRENCH AND ADDING TOPPING (

Status
Prospective
Sector
Water Supply and Storage, Nuclear, Chemical (Industrial), Road, Manufacturing (Industrial), Commercial
Location
San Diego, United States of America
Updated
19 Nov 2026
Source
City of San Diego Development Permits

ConstructChat

Ask ConstructChat about Express- CIP or Public Project:1902/Gatchell

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Express- CIP or Public Project:1902/Gatchell” is an infrastructure initiative in the Water Supply and Storage sector, located in San Diego, United States. Taiyo aggregates data on it from City of San Diego Development Permits.

Participants

Not available for this record.

Status

Original status

inspection followup

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

PENINSULA: Building Mechanical, Electrical and Plumbing permit for: New Water Purification Demonstration Facility named “Central Area Small-Scale Facility” Processed, Structures and Systems 2. ELEVATED STRUCTURAL SLABS ON PILE FOUNDATIONS (6,577 SQ. FT.) AND 3 MAT SLABS-ON-GROUND (3,443 SQ. FT.). ONE MAT SLAB WILL BE MODIFIED BY REMOVING (E) EQUIPMENT PADS, INFILLING A TRENCH AND ADDING TOPPING (1,860 SQ. FT.). NINETY SEVEN PIECES OF EQUIPMENT WILL BE ANCHORED. THERE ARE RETAINING WALLS TOTALING 134 LF FOR 3’-6” AND UNDER, 88 LF FOR 5’-6” AND UNDER AND 197 LF FOR 7’-6” AND UNDER. ADA Review B-21151 uploaded under applicant response to issues. DEFERRED APPROVALS 1. (1) PREMANUFACTURED ELECTRICAL ENCLOSURE INCLUDING HVAC 480 SQ. FT. 2. (3) PREMANUFACTURED CLOTH CANOPIES TOTALING 2,513 SQ. FT. 1. Process Facilities Includes A, Primary Influent and Primary Effluent feed pumps B, Blend Tank C, Biological nutrient removal (BNR) System D, Membrane Bio Reactor (MBR) System E, Ozone Treatment F, Biological Activated Carbon Filtration G, Membrane filtration H, Reverse Osmosis I, Ultraviolent / Advanced Oxidation Process 2. Support Systems Included A, Chemical Storage and Delivery Systems B, Electrical and Control 3. Perform Site Work Grading, New Pavement and Yard pipes.

Original sector

Public Works/Utilities Bldg

Budget

Location

Country

United States of America (USA)

City

San Diego

Source

Source

City of San Diego Development Permits

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Nuclear, Chemical (Industrial), Road, Manufacturing (Industrial), Commercial

Article published date

2026-04-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project