Expressway from Narsingi to Kollur
Sector: Road • Location: India
Source: World Bank Group
In November 2007, Hyderabad Urban Development Authority (HUDA) signed a 15 year contract (includes a construction period of 30 months) with a consortium of Era Infra Engineering Limited (EIEL)and Switzerland-based infrastructure development company, Induni and Cie S.A. for design, construction, development, finance, operation and maintenance of an eight lane 12 km stretch on Outer Ring Road (ORR)
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | In November 2007, Hyderabad Urban Development Authority (HUDA) signed a 15 year contract (includes a construction period of 30 months) with a consortium of Era Infra Engineering Limited (EIEL)and Switzerland-based infrastructure development company, Induni and Cie S.A. for design, construction, development, finance, operation and maintenance of an eight lane 12 km stretch on Outer Ring Road (ORR) between Narsingi and Kollur, in Andhra Pradesh. It is a part of Greater Hyderabad Growth Corridor Project (Outer Ring Road Project). Hyderabad Ring Road Project Pvt. Ltd. (HRRPPL)was established to implement the project. The project was won through an international competitive bidding, conducted by HUDA. The bidding criteria for the project was lowest annuity payment. HRRPPL was to recover for the capital and operating costs by way of a fixed annual payment (annuity) from HUDA during the operation period. Under the annuity scheme, the private operator was not allowed to collect tolls from the users. The total capital cost of the project was estimated at US$ 75 million. Construction work on the project began in November 2007 and was expected to be completed by April 2010. www.projectstoday.com www.pppinindia.com |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |