EXTDEM 73 Ruthven ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Remove rear decks at above location, decks occur at all three floors. Infill existing exterior doors, side at old door openings and install siding to match existing. No change of egress (rear hall stairs) Decks will not be rebuilt.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTDEM 73 Ruthven ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remove rear decks at above location, decks occur at all three floors. Infill existing exterior doors, side at old door openings and install siding to match existing. No change of egress (rear hall stairs) Decks will not be rebuilt. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
