Extension of ISTS Charge Waivers for Solar and Wind Projects
Sector: Solar • Location: India
Source: Megaproject
The Ministry of Power has extended the benefit of Inter-State Transmission System (ISTS) charge waivers for solar and wind projects facing commissioning delays due to non-readiness of transmission infrastructure. Projects with a firm start date of connectivity between July 1, 2025 and June 30, 2028 remain eligible for graded ISTS charge waivers even if commissioning is delayed due to transmission
- Status
- Prospective
- Sector
- Solar, Wind, Power Generation (CCGT)
- Location
- India
- Updated
- 22 Jul 2026
- Source
- Megaproject
ConstructChat
Ask ConstructChat about Extension of ISTS Charge Waivers for Solar and Wind Projects
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Ministry of Power has extended the benefit of Inter-State Transmission System (ISTS) charge waivers for solar and wind projects facing commissioning delays due to non-readiness of transmission infrastructure. Projects with a firm start date of connectivity between July 1, 2025 and June 30, 2028 remain eligible for graded ISTS charge waivers even if commissioning is delayed due to transmission constraints. Projects with connectivity on or before June 30, 2025 may be eligible for 100% waiver. |
Original sector | Energy |
Location
Country | India |
Source
Source | Megaproject |
URL |
More Details
Record type | Project |
Sector | Solar, Wind, Power Generation (CCGT) |
Article published date | 2026-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
