EXTREN 101 E Brookline ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
REMOVE AND REPLACE FOUR STORM WINDOWS IN FRONT OF BUILDING. Color of storm windows should closeley match trim to which they ar eaffixed. Storm windows should be narrow frame and not protrude beyond the forced pane of the building. Storms should closely align with the window sash. Natural unpainted aluminum is not allowed.
- Status
- Prospective
- Sector
- Steel, Metal, Commercial, Government
- Location
- Roxbury, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTREN 101 E Brookline ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | REMOVE AND REPLACE FOUR STORM WINDOWS IN FRONT OF BUILDING. Color of storm windows should closeley match trim to which they ar eaffixed. Storm windows should be narrow frame and not protrude beyond the forced pane of the building. Storms should closely align with the window sash. Natural unpainted aluminum is not allowed. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Roxbury |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Steel, Metal, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- REPLACE DAMAGED STEEL COLUMN
- Courthouse Commons Tunnel
- Los Angeles City Hall
