EXTREN 116-118 Hillside ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
INSTALL 16 REPLACEMENT WINDOWS U.30 INSTALL SIX DOORS ALL SAME SIZE AS EXISTING INSTALL NEW ROOFING ONE LAYER GO OVER. INSTALL VINYL SIDING TO COMPLETE WALL AREA OF HOUSE. COVER ALL TRIM . REBUILD REAR PORCH SAME SIZE AS EXISING. TWO FLOORS 2X8 JOIST 4X6 POSTS THREE FOOTINGS 10X48 36 INCH RAILINGS. 18NEW FLOORING
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Mission Hill, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTREN 116-118 Hillside ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | INSTALL 16 REPLACEMENT WINDOWS U.30 INSTALL SIX DOORS ALL SAME SIZE AS EXISTING INSTALL NEW ROOFING ONE LAYER GO OVER. INSTALL VINYL SIDING TO COMPLETE WALL AREA OF HOUSE. COVER ALL TRIM . REBUILD REAR PORCH SAME SIZE AS EXISING. TWO FLOORS 2X8 JOIST 4X6 POSTS THREE FOOTINGS 10X48 36 INCH RAILINGS. 18`X6`NEW FLOORING |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Mission Hill |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
