EXTREN 13 Park ST
Open · Massachusetts
Source: City of Boston
•remove top 10’ of 2 chimneys on side of building. Dispose of material and cap chimney with limestone cap. •Both chimneys are not in use. •Patch exposed areas as needed. Remove existing plywood rake board on side of building. Replace with composite material. • Patch returns on front and rear facia as well. • Patch roof area where chimneys were as well as front returns at end of front and rear ak
- Status
- Prospective
- Sector
- Commercial, Government, Manufacturing (Industrial)
- Location
- Charlestown, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTREN 13 Park ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | •remove top 10’ of 2 chimneys on side of building. Dispose of material and cap chimney with limestone cap. •Both chimneys are not in use. •Patch exposed areas as needed. Remove existing plywood rake board on side of building. Replace with composite material. • Patch returns on front and rear facia as well. • Patch roof area where chimneys were as well as front returns at end of front and rear ake meets facia. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Charlestown |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Manufacturing (Industrial) |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
