EXTREN 149 Howard AV
Sector: Commercial • Location: Dorchester, Massachusetts, United States of America
Source: City of Boston
Demotion remove existing Rotten Doorway and encasement entrance into the basement. Then Rebuilding with new Framing, Plywood sub wall, Installing new siding, door, windows, Trims, casing, Roofing shingle, Painting.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTREN 149 Howard AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Demotion remove existing Rotten Doorway and encasement entrance into the basement. Then Rebuilding with new Framing, Plywood sub wall, Installing new siding, door, windows, Trims, casing, Roofing shingle, Painting. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
