logo
ProjectOpenBP

EXTREN 157 Beaver ST

The status, timeline and source of this project. A free account opens every field.

Source: City of Boston

Roof: tear off existing roof to the roof deck, any damaged roof installed $75.00/ sheet of 5/8 cdx play-off, install 30 year architectural shingles (color to be determined by owner), 6 feet of Ice Water on all sides, #15 felt paper, 10"lead, 1-1/4 galvanized nails, F8 drip edge, roof flashing, and new pipe boots.

Replace windows with Low E and argon gas vinyl replacement windows.

Dining room cei

Status
Prospective
Sector
Water Supply and Storage, Steel, Forest Products and Packaging, Commercial, Government, Metal
Location
Hyde Park, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about EXTREN 157 Beaver ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “EXTREN 157 Beaver ST” is an infrastructure initiative in the Water Supply and Storage sector, located in Hyde Park, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Roof: tear off existing roof to the roof deck, any damaged roof installed $75.00/ sheet of 5/8 cdx play-off, install 30 year architectural shingles (color to be determined by owner), 6 feet of Ice Water on all sides, #15 felt paper, 10"lead, 1-1/4 galvanized nails, F8 drip edge, roof flashing, and new pipe boots. Replace windows with Low E and argon gas vinyl replacement windows. Dining room ceiling demolition and put up insulation and 1/2 blue board, plaster and primed so it is ready for paint Kitchen ceiling cover with 3/8 blue board plaster and prime so it is ready to paint Living room ceiling demolition and put up insulation and install 1/2 blue board, plaster and prime so it's ready to paint Guest bedroom ceiling covered with 3/8 plastered and primed so it ready to paint Front Hallway covered with 3/8 sheets of blue board, plastered and primed so it is ready to paint Bedroom fix one wall covering with 3/8 bluebird, plaster and prime so it is ready to paint Second unit hallway cover one side of the hallway with 3/8 blue board plastered and primed so it is ready for paint Front door replaced (500.00 allowance on choice of door) (75.00 on hardware) Reinstall door in the back entry New flush steel door in basement, insulated around frame if possible Attic ashes to secure the ceiling, covered and primed so it ready to paint Kitchen to dining room change/ increase passage size in both apt's includes all electrical work First floor cabinets remove base cabinet to fit dishwasher, this includes all plumbing and electrical) Baseboard repairs and installation, painted/ stained to match existing Insulate ceiling area where demo in ceilings.

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Hyde Park

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Steel, Forest Products and Packaging, Commercial, Government, Metal

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project