EXTREN 157 Beaver ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Roof: tear off existing roof to the roof deck, any damaged roof installed $75.00/ sheet of 5/8 cdx play-off, install 30 year architectural shingles (color to be determined by owner), 6 feet of Ice Water on all sides, #15 felt paper, 10"lead, 1-1/4 galvanized nails, F8 drip edge, roof flashing, and new pipe boots.
Replace windows with Low E and argon gas vinyl replacement windows.
Dining room cei
- Status
- Prospective
- Sector
- Water Supply and Storage, Steel, Forest Products and Packaging, Commercial, Government, Metal
- Location
- Hyde Park, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTREN 157 Beaver ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Roof: tear off existing roof to the roof deck, any damaged roof installed $75.00/ sheet of 5/8 cdx play-off, install 30 year architectural shingles (color to be determined by owner), 6 feet of Ice Water on all sides, #15 felt paper, 10"lead, 1-1/4 galvanized nails, F8 drip edge, roof flashing, and new pipe boots. Replace windows with Low E and argon gas vinyl replacement windows. Dining room ceiling demolition and put up insulation and 1/2 blue board, plaster and primed so it is ready for paint Kitchen ceiling cover with 3/8 blue board plaster and prime so it is ready to paint Living room ceiling demolition and put up insulation and install 1/2 blue board, plaster and prime so it's ready to paint Guest bedroom ceiling covered with 3/8 plastered and primed so it ready to paint Front Hallway covered with 3/8 sheets of blue board, plastered and primed so it is ready to paint Bedroom fix one wall covering with 3/8 bluebird, plaster and prime so it is ready to paint Second unit hallway cover one side of the hallway with 3/8 blue board plastered and primed so it is ready for paint Front door replaced (500.00 allowance on choice of door) (75.00 on hardware) Reinstall door in the back entry New flush steel door in basement, insulated around frame if possible Attic ashes to secure the ceiling, covered and primed so it ready to paint Kitchen to dining room change/ increase passage size in both apt's includes all electrical work First floor cabinets remove base cabinet to fit dishwasher, this includes all plumbing and electrical) Baseboard repairs and installation, painted/ stained to match existing Insulate ceiling area where demo in ceilings. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Hyde Park |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Forest Products and Packaging, Commercial, Government, Metal |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
