EXTREN 16-18 Centre ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Masonry Repair damaged stone-band as needed at roofline then repaint to match existing color as closely as possible after all repairs are completed. Remove and replace loose bricks under windows as need front, left, and right elevation of building. Cut and repaint deteriorated mortar joints at the above elevations. Repair damaged stone sills and lintels as needed then repaint to match existing col
- Status
- Prospective
- Sector
- Cement, Commercial, Government
- Location
- Roxbury, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTREN 16-18 Centre ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Masonry Repair damaged stone-band as needed at roofline then repaint to match existing color as closely as possible after all repairs are completed. Remove and replace loose bricks under windows as need front, left, and right elevation of building. Cut and repaint deteriorated mortar joints at the above elevations. Repair damaged stone sills and lintels as needed then repaint to match existing color as closely as possible at the above three elevations. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Roxbury |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Cement, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
