EXTREN 172 Commonwealth AV
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
Remove front exterior sidewalk and planter Excavate underlying base and fill with crushed stone Pour new concrete with steel reinforcement Rubbberized membrane to be installed on top of concrete Installation of sidewalk and planter to match existing.(max height 2 1/2 ')
- Status
- Prospective
- Sector
- Car parking, Steel, Cement, Commercial, Government, Metal, Automotive
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTREN 172 Commonwealth AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remove front exterior sidewalk and planter Excavate underlying base and fill with crushed stone Pour new concrete with steel reinforcement Rubbberized membrane to be installed on top of concrete Installation of sidewalk and planter to match existing.(max height 2 1/2 ') |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Car parking, Steel, Cement, Commercial, Government, Metal, Automotive |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
