EXTREN 23 Cedarcrest CI
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Intalling resistance piers to transfer the weight of the house off of the unstable soil to piers which will be sitting on stable soil or bedrock. Use galvanized brackets, tubes and hydraulics to drive piers down past loose soil to the acceptable engineered pressure to transfer the weight of the home off of the loose ground.
- Status
- Prospective
- Sector
- Residential, Commercial, Government
- Location
- West Roxbury, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTREN 23 Cedarcrest CI
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Intalling resistance piers to transfer the weight of the house off of the unstable soil to piers which will be sitting on stable soil or bedrock. Use galvanized brackets, tubes and hydraulics to drive piers down past loose soil to the acceptable engineered pressure to transfer the weight of the home off of the loose ground. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | West Roxbury |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Residential, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
