EXTREN 247 Everett ST
Open · Massachusetts
Source: City of Boston
Deck Inspect Ledger Board connection/Install (2) 3x4 metal brackets with 4 x 1/2 lag bolts. Replace 2x4 post with 4x4 post. Add 2x6 nailers.
Basement: Install double floor joist to reinforce frame under bathroom
- Status
- Prospective
- Sector
- Metal, Commercial, Government
- Location
- East Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTREN 247 Everett ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Deck Inspect Ledger Board connection/Install (2) 3x4 metal brackets with 4 x 1/2 lag bolts. Replace 2x4 post with 4x4 post. Add 2x6 nailers. Basement: Install double floor joist to reinforce frame under bathroom |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | East Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Metal, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
