logo
ProjectOpenBP

EXTREN 25 Upton ST

Sector: Road • Location: Roxbury, Massachusetts, United States of America

Source: City of Boston

• Install new brick, from Stiles & Hart Brick Co, on the back wall • Install wall ties 12inch vertical x 16 inches horizontal (22 gauges hot-dip galvanized 7/8 by 7) to the masonry on the existing building • Replace three lintels and two sill windows on the third, fourth, and fifth floor (precast concrete to match brownstone) • Rebuild the cornice to match the remaining existing cornice • Insta

Status
Prospective
Sector
Road, Cement, Commercial, Government
Location
Roxbury, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about EXTREN 25 Upton ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “EXTREN 25 Upton ST” is an infrastructure initiative in the Road sector, located in Roxbury, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

• Install new brick, from Stiles & Hart Brick Co, on the back wall • Install wall ties 12inch vertical x 16 inches horizontal (22 gauges hot-dip galvanized 7/8 by 7) to the masonry on the existing building • Replace three lintels and two sill windows on the third, fourth, and fifth floor (precast concrete to match brownstone) • Rebuild the cornice to match the remaining existing cornice • Install helibar on every other course 10 feet away from the building on 23 Upton Street • Install blocking between joists and install ASTM A-36 tie rods, hot dipped galvanized with A-36 galvanized plates outside • Paint the plate with Rustoleum 3700 DTM primer, then with Rustoleum 3700 series DTM glass black paint • Cut ceiling plaster, to gain access to the floor joists and when done, patch the plaster with plasterboard, with joints taped and finished with joint compound. • All dust and debris from cutting of plaster shall be removed at the end of each workday. • Reset any window frames that are loose • Caulk the joint between the masonry opening as well as the wood window frame with high quality acrylic or butyl caulk

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Roxbury

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Road, Cement, Commercial, Government

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project