EXTREN 2599-2601 Beacon ST
Sector: Road • Location: Brighton, Massachusetts, United States of America
Source: City of Boston
The proposed work is on the field inside alumni stadium. It is occurring in an open air environment. The work is to be conducted by McCourt Construction. The work consists of removing an old turf, regrading a gravel base, milling an asphalt track, paving an asphalt track, installing a new turf and installing a decorative skirting around the bottom of the bleachers which consists of a brick faca
- Status
- Prospective
- Sector
- Road, Stadium, Commercial, Government
- Location
- Brighton, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTREN 2599-2601 Beacon ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The proposed work is on the field inside alumni stadium. It is occurring in an open air environment. The work is to be conducted by McCourt Construction. The work consists of removing an old turf, regrading a gravel base, milling an asphalt track, paving an asphalt track, installing a new turf and installing a decorative skirting around the bottom of the bleachers which consists of a brick facade and hangs from the bottom of the bleachers. It is my understanding after reviewing the plans with Neil Sullivan in the Building department that the portion of this work which requires a short form permit is the brick facade which hangs from the bleachers. The work is to be conducted from May 25th - August 31st. The total Contract is for $2,015,093 but the total of the brick facade work is $590,400.00 It is my understanding the permit fee will apply to the facade work. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Brighton |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Road, Stadium, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
