EXTREN 347 Sumner ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
SP #12 4-28-2017 Ending 5-18-2017.
Confirm occupancy as a single family home.; Remove 19x16 roof back the house.... lift uu walls 8'-6".. New roof framing 2x10 oc...pitch will be 3 to 12. install siding match existing 18 x 19 long.. install 3 new Windows double hang... replace hardwood floor only in the new addition....
- Status
- Prospective
- Sector
- Commercial, Residential, Government
- Location
- East Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTREN 347 Sumner ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | SP #12 4-28-2017 Ending 5-18-2017. Confirm occupancy as a single family home.; Remove 19x16 roof back the house.... lift uu walls 8'-6".. New roof framing 2x10 oc...pitch will be 3 to 12. install siding match existing 18 x 19 long.. install 3 new Windows double hang... replace hardwood floor only in the new addition.... |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | East Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Residential, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
