EXTREN 398 Beacon ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
Repair roof and reinstall existing deck (deck was temporarily removed due to severe water damage.) Reference SF20879. deck is to be built back to original footprint but all wooden railings will be changed to wrought iron railings as approved by BBAC these railings will show a 4" gap between all horizontal runs and vertical ballasters while maintaining a 40" height
- Status
- Prospective
- Sector
- Water Supply and Storage, Metal, Commercial, Government, Steel
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTREN 398 Beacon ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Repair roof and reinstall existing deck (deck was temporarily removed due to severe water damage.) Reference SF20879. deck is to be built back to original footprint but all wooden railings will be changed to wrought iron railings as approved by BBAC these railings will show a 4" gap between all horizontal runs and vertical ballasters while maintaining a 40" height |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Metal, Commercial, Government, Steel |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
