EXTREN 46 Torrey ST
Open · Massachusetts
Source: City of Boston
Remove 6X18 front porch. No size or structural changes to porch. Install new footings where required.Reframe entire 6X18 front porch with pressure treated material. Install composite decking boards and stairs. Install pressure treated railings on porch and stairs.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTREN 46 Torrey ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remove 6X18 front porch. No size or structural changes to porch. Install new footings where required.Reframe entire 6X18 front porch with pressure treated material. Install composite decking boards and stairs. Install pressure treated railings on porch and stairs. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
