EXTREN 49 Greenbrier ST
Open · Massachusetts
Source: City of Boston
Remove first and second level porches. Install new 6x18 first and second level porches. NO SIZE OR STRUCTURAL CHANGES SAME AS EXISTING. New porches will be pressure treated framing, composite decking boards, vinyl railings and EPDM .060 gauge rubber system between first and second level porch.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTREN 49 Greenbrier ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remove first and second level porches. Install new 6x18 first and second level porches. NO SIZE OR STRUCTURAL CHANGES SAME AS EXISTING. New porches will be pressure treated framing, composite decking boards, vinyl railings and EPDM .060 gauge rubber system between first and second level porch. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
