EXTREN 52 Hull ST
Open · Massachusetts
Source: City of Boston
Set up a protection plywood on top of the neighbors roof Set up a scaffold Cut and point the entire wall, left facade Install siloxane PD sealer on the left facade Dismantle scaffold Clean the deteriorated bricks inside Install cement on top of the deteriorated bricks Remove and replace the deteriorated bricks on the back entrance
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTREN 52 Hull ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Set up a protection plywood on top of the neighbors roof Set up a scaffold Cut and point the entire wall, left facade Install siloxane PD sealer on the left facade Dismantle scaffold Clean the deteriorated bricks inside Install cement on top of the deteriorated bricks Remove and replace the deteriorated bricks on the back entrance |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
