EXTREN 60 Queensberry ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Back Facades: Using HEPA vacuum system, cut out / repoint approx. 4,000 sq/ft brick joints. Replace boiler door. Add missing window panning, apply new sealant windows. Replace approx. 350 sq/ft spalled brick. Front: Cut/Repoint approx. 930 sq/ft masonry joints. Window Sealant. Repair precast feature
- Status
- Prospective
- Sector
- Cement, Commercial, Government
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTREN 60 Queensberry ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Back Facades: Using HEPA vacuum system, cut out / repoint approx. 4,000 sq/ft brick joints. Replace boiler door. Add missing window panning, apply new sealant windows. Replace approx. 350 sq/ft spalled brick. Front: Cut/Repoint approx. 930 sq/ft masonry joints. Window Sealant. Repair precast feature |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Cement, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
