EXTREN 62 Union ST
Open · Massachusetts
Source: City of Boston
To remove a strip of 60" alongside of driveway and relocate knee stone wall to enlarge driveway entrance; To dig a foundation opening to accommodate a 7' X 15' concrete slab of 4" thick with a steel mesh inside it. Pitch 2" from the house; Install two granite steps measuring 14" x 48" at one of the ends of the concrete slab.
- Status
- Prospective
- Sector
- Road, Steel, Cement, Commercial, Government, Metal
- Location
- Brighton, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTREN 62 Union ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | To remove a strip of 60" alongside of driveway and relocate knee stone wall to enlarge driveway entrance; To dig a foundation opening to accommodate a 7' X 15' concrete slab of 4" thick with a steel mesh inside it. Pitch 2" from the house; Install two granite steps measuring 14" x 48" at one of the ends of the concrete slab. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Brighton |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Road, Steel, Cement, Commercial, Government, Metal |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
