EXTREN 7 W Cedar ST
Sector: Metal • Location: Boston, Massachusetts, United States of America
Source: City of Boston
Resurface the brownstone lintels and sills using a cementitious stucco; replace 2 ea. eight-light hopper, twenty-eight ea. six-over-six and two ea. three-over-three double hung wood windows with dark gray finish. Replace deteriorated and missing louvered shutters with dark gray finish. Replace window boxes with new removable window boxes at the 1st floor. Repaint the entry door dark gray and th
- Status
- Prospective
- Sector
- Metal, Commercial, Government, Manufacturing (Industrial), Steel
- Location
- Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTREN 7 W Cedar ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Resurface the brownstone lintels and sills using a cementitious stucco; replace 2 ea. eight-light hopper, twenty-eight ea. six-over-six and two ea. three-over-three double hung wood windows with dark gray finish. Replace deteriorated and missing louvered shutters with dark gray finish. Replace window boxes with new removable window boxes at the 1st floor. Repaint the entry door dark gray and the trim off-white; Replace the non-historic glazing in the sidelights at the entryway with clear glazing; Repaint the iron work dark gray; Replace slate shingles; copper gutters and leaders in-kind. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Metal, Commercial, Government, Manufacturing (Industrial), Steel |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
