EXTREN 725-751 Shawmut AV
Sector: Steel • Location: Mission Hill, Massachusetts, United States of America
Source: City of Boston
Removal of the existing brick, repair/replacement of wall flashing, scrape prime and paint the existing steel lintels and relieving angles, installation of new brick masonry and accessories at (3) 26' wide drops along Shawmut Ave elevation. Minor repointing.
- Status
- Prospective
- Sector
- Steel, Cement, Commercial, Government, Metal
- Location
- Mission Hill, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTREN 725-751 Shawmut AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Removal of the existing brick, repair/replacement of wall flashing, scrape prime and paint the existing steel lintels and relieving angles, installation of new brick masonry and accessories at (3) 26' wide drops along Shawmut Ave elevation. Minor repointing. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Mission Hill |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Steel, Cement, Commercial, Government, Metal |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
