logo
ProjectOpenBP

EXTREN 73 Mount Vernon ST

Open · Massachusetts

Source: City of Boston

Replace the six over six windows at the fourth floor front facade, second floor ell extension and third and fourth floor rear facade with two over two, double hung wood windows with a black painted finish; replacing the slate single lite casement windows at the fifth floor with single lite wood casement windows with a black painted finish; replacing two over four single hung at the first and secon

Status
Prospective
Sector
Water Supply and Storage, Metal, Commercial, Government, Manufacturing (Industrial), Steel
Location
Boston, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about EXTREN 73 Mount Vernon ST

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “EXTREN 73 Mount Vernon ST” is an infrastructure initiative in the Water Supply and Storage sector, located in Boston, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Replace the six over six windows at the fourth floor front facade, second floor ell extension and third and fourth floor rear facade with two over two, double hung wood windows with a black painted finish; replacing the slate single lite casement windows at the fifth floor with single lite wood casement windows with a black painted finish; replacing two over four single hung at the first and second floors and two over two double hung at the third floor and second floor rear, all wood windows with a black painted finish in kind; repainting the iron railings and entry door black and entryway surround white; replacing slate shingles on the setback penthouse in kind; and replacing all copper gutters and leaders in kind. Replacement shingles will match the historic in terms of material, size, color and profile. Replacement copper gutters and leaders will help keep the building water tight and will aid in the long term preservation of the building. See Historic Decision under the attachments tab for this application.

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Boston

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Metal, Commercial, Government, Manufacturing (Industrial), Steel

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project