EXTREN 74-76 Poplar ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
repairing front porch , three levels .Replacing side railing and floors using fir .Reenforcing all the floors with 2x10x10 PT . On second and third floor insulate watertite with rubber. Replace existing ceiling with vinyl planking .Replace the flashing , gutter and down spout.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Roslindale, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTREN 74-76 Poplar ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | repairing front porch , three levels .Replacing side railing and floors using fir .Reenforcing all the floors with 2x10x10 PT . On second and third floor insulate watertite with rubber. Replace existing ceiling with vinyl planking .Replace the flashing , gutter and down spout. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Roslindale |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
