EXTREN 88 Devon ST
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: City of Boston
Remove all rotted wood from front and back porches. Rebuild rubber roof between 1st and 2nd floor. Install pressure treated framing. Install fir decking boards and railings. Install pressure treated framing to rear porches. Install composite decking boards to rear porches. Install PT railings to rear porches. No Structural or size changes. Install new gutters and downspouts.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTREN 88 Devon ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remove all rotted wood from front and back porches. Rebuild rubber roof between 1st and 2nd floor. Install pressure treated framing. Install fir decking boards and railings. Install pressure treated framing to rear porches. Install composite decking boards to rear porches. Install PT railings to rear porches. No Structural or size changes. Install new gutters and downspouts. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
