EXTREN 99 Deforest ST
Sector: Commercial • Location: Hyde Park, Massachusetts, United States of America
Source: City of Boston
We want to change the retaining walls from poured concrete to 12" concrete block with rebar and block filled with concrete in side of cavity of the block. due to the restriction of the existing neighboring wall on the right side of the work area and the existing gas line on the left side of the work. The permit to be amended is ALT1383681
- Status
- Prospective
- Sector
- Commercial, Steel, Cement, Government
- Location
- Hyde Park, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about EXTREN 99 Deforest ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | We want to change the retaining walls from poured concrete to 12" concrete block with rebar and block filled with concrete in side of cavity of the block. due to the restriction of the existing neighboring wall on the right side of the work area and the existing gas line on the left side of the work. The permit to be amended is ALT1383681 |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Hyde Park |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Steel, Cement, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
