Eyre Peninsula Upgrade
Sector: Steel • Location: Cultana to Yadnarie, South Australia, Australia
Source: PV Tech
An upgrade of the 132kV double circuit line from Cultana to Yadnarie with the option to upgrade to 275kV to support future load development from energy-intensive industries including mining, data centres, and green steel processing.
- Status
- Prospective
- Sector
- Steel, Power Generation (CCGT), Hydrogen
- Location
- Cultana to Yadnarie, South Australia, Australia
- Updated
- 22 Jul 2026
- Source
- PV Tech
ConstructChat
Ask ConstructChat about Eyre Peninsula Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | An upgrade of the 132kV double circuit line from Cultana to Yadnarie with the option to upgrade to 275kV to support future load development from energy-intensive industries including mining, data centres, and green steel processing. |
Original sector | Energy |
Location
Country | Australia |
State | South Australia |
City | Cultana to Yadnarie |
Source
Source | PV Tech |
URL |
More Details
Record type | Project |
Sector | Steel, Power Generation (CCGT), Hydrogen |
Article published date | 2026-04-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
