F 1/2 Road Parkway Phase 1
Sector: Water Supply and Storage • Location: Grand Junction, Colorado, United States of America
Source: Dodge USA
This Project generally consists of doubling the existing right-ofway and drivable surface of F 1/2 Road between 24 Road and Market Street. The new right-of-way will be expanded to the north, totaling 160-ft, with road improvements extending to the north approximately 93 feet. The road improvements include a 30-ft median, 16-ft total width for shoulders, 11-ft drive lanes for east and west-bound tr
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Road, Automotive, Government, Commercial
- Location
- Grand Junction, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about F 1/2 Road Parkway Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This Project generally consists of doubling the existing right-ofway and drivable surface of F 1/2 Road between 24 Road and Market Street. The new right-of-way will be expanded to the north, totaling 160-ft, with road improvements extending to the north approximately 93 feet. The road improvements include a 30-ft median, 16-ft total width for shoulders, 11-ft drive lanes for east and west-bound traffic, curb and gutter, a 12.5-ft landscape strip and a 10-ft wide detached sidewalk. East of the... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Grand Junction |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Road, Automotive, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
