F1RST
Closed · United States of America
Source: Clark Construction
F1RST features a 13-story, 327,000-square-foot apartment building and a 12-story, 126,000-square-foot hotel. The two buildings share two levels of below-grade parking. The residential building features amenity areas including a pool, a fitness center, game-day viewing areas, and a second-floor courtyard terrace. Awards 2018 NAIOP DC|MD Award of Merit - Best Multi-Family Project (DC)
- Status
- Closed
- Sector
- Car parking, Commercial, Hotel, Residential, Automotive, Hospital
- Location
- Washington, dc, United States of America
- Updated
- 22 Jul 2026
- Source
- Clark Construction
ConstructChat
Ask ConstructChat about F1RST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | F1RST features a 13-story, 327,000-square-foot apartment building and a 12-story, 126,000-square-foot hotel. The two buildings share two levels of below-grade parking. The residential building features amenity areas including a pool, a fitness center, game-day viewing areas, and a second-floor courtyard terrace. Awards 2018 NAIOP DC|MD Award of Merit - Best Multi-Family Project (DC) |
Location
Country | United States of America (USA) |
City | Washington, dc |
Source
Source reliability | High |
Source | Clark Construction |
URL |
More Details
Record type | Project |
Sector | Car parking, Commercial, Hotel, Residential, Automotive, Hospital |
Article published date | 2023-08-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
