FA 24 Dry Dock AV
Open · Massachusetts
Source: City of Boston
NOREL IS REPLACING A DISCONTINUED, NON WORK CONVENTIONAL FIRE ALARM SYSTEM WITH A NEW ADDRESSABLE FIRE ALARM PANEL AND TEMPORARY CONVENTIONAL DEVICES. THIS IS A VACANT, UN HEATED, BUILDING. THE TEMPORARY DEVICES WILL BE REPLACED WITH NEW ADDRESSABLE DEVICES WHEN THE BUILDING IS FITTED OUT AND BROUGHT UP TO FIRE ALARM CODE REQUIREMENTS. (2)STAMPED DRAWINGS AND SCOPE OF WORK BEING SUBMITTED.
- Status
- Prospective
- Sector
- Commercial, Government
- Location
- South Boston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about FA 24 Dry Dock AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | NOREL IS REPLACING A DISCONTINUED, NON WORK CONVENTIONAL FIRE ALARM SYSTEM WITH A NEW ADDRESSABLE FIRE ALARM PANEL AND TEMPORARY CONVENTIONAL DEVICES. THIS IS A VACANT, UN HEATED, BUILDING. THE TEMPORARY DEVICES WILL BE REPLACED WITH NEW ADDRESSABLE DEVICES WHEN THE BUILDING IS FITTED OUT AND BROUGHT UP TO FIRE ALARM CODE REQUIREMENTS. (2)STAMPED DRAWINGS AND SCOPE OF WORK BEING SUBMITTED. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | South Boston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
