Facilities And Transportation Building
Sector: Water Supply and Storage • Location: Onalaska, Wisconsin, United States of America
Source: Dodge USA
In general, the project consists ofa new single story facility located on the existing Onalaska High School property in Onalaska,WI.The site work will include site preparation, excavatingand earthwork, site utilities, asphalt parking lots, site concrete, storm water management, andlandscaping. The building will have 9,600 sq. ft. of new single story construction. Included will beconcrete footings
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Car parking, Power Transmission, Road, Education, Cement, Metal, Government, Automotive, Power Generation (CCGT)
- Location
- Onalaska, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Facilities And Transportation Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In general, the project consists ofa new single story facility located on the existing Onalaska High School property in Onalaska,WI.The site work will include site preparation, excavatingand earthwork, site utilities, asphalt parking lots, site concrete, storm water management, andlandscaping. The building will have 9,600 sq. ft. of new single story construction. Included will beconcrete footings and foundations, cast stone masonry, PEMB (Pre-engineered metal building), metal studs, cold form... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Onalaska |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Car parking, Power Transmission, Road, Education, Cement, Metal, Government, Automotive, Power Generation (CCGT) |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
