Facility Maintenance Phase 1 & 2 MATOC
One of 10,000+ projects Taiyo tracks in Missouri.
Source: Dodge
Individual projects may incorporate facility maintenance, road/traffic improvements, and building/facility construction to include reinforced concrete foundations, steel frame and roof system, insulated metal walls, utilities, and all other necessary work for complete and usable support facilities. Supporting facilities can include site utilities; electric service; security lighting; fire protecti
- Status
- Prospective
- Sector
- Power Generation (CCGT), Car parking, Road, Automotive, Cement, Power Transmission, Steel, Metal, Manufacturing (Industrial), Commercial, Residential
- Location
- Kansas City, Missouri, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Facility Maintenance Phase 1 & 2 MATOC
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Individual projects may incorporate facility maintenance, road/traffic improvements, and building/facility construction to include reinforced concrete foundations, steel frame and roof system, insulated metal walls, utilities, and all other necessary work for complete and usable support facilities. Supporting facilities can include site utilities; electric service; security lighting; fire protection and alarm system; paving, walks, curbs, and gutters, parking, and site improvements; storm dra... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Kansas City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Car parking, Road, Automotive, Cement, Power Transmission, Steel, Metal, Manufacturing (Industrial), Commercial, Residential |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
