logo

Facility Structural and Site Improvements

Sector: Commercial • Location: Georgia, United States of America (USA)

Source: Atlanta Watershed

Project
Active

General plant and capitalized maintenance necessary for several DWM properties. Some buildings have leaking roofs that damage interiors and threaten to damage equipment. For several of these roofs, repair is not as cost-effective as replacement. Additional roof appurtenances could include flashing, roof drains, gutter systems, parapet and scupper repair/replacement, etc., as would be necessary to

Project Information FAQ

Project Information

5 Q
The project “Facility Structural and Site Improvements” is an infrastructure initiative in the Commercial sector, located in Georgia, United States of America (USA). Taiyo aggregates data on it from Atlanta Watershed.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

General plant and capitalized maintenance necessary for several DWM properties. Some buildings have leaking roofs that damage interiors and threaten to damage equipment. For several of these roofs, repair is not as cost-effective as replacement. Additional roof appurtenances could include flashing, roof drains, gutter systems, parapet and scupper repair/replacement, etc., as would be necessary to create a complete watertight roofing system. HVAC systems, elevators, pavement, fences, and gates at numerous locations in need of complete rehabilitation or replacement. The scope of this project includes: Replacement of building infrastructure where maintenance is not cost- effective. Some of the locations included in this effort are: R.M. Clayton Water Reclamation Center Administration building Chattahoochee Water Treatment Plant Hemphill Water Treatment Plant Chattahoochee Raw Water Intake Building South River Water Reclamation Center Office, Trailers, Roofs Various Intrenchment Creek Water Reclamation Center Guard Shack Roof 14th Street Administrative & CMD Buildings

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data