Factory Building Addition
Start · Georgia · Last reported Sep 2025
Source: Dodge
This Project Involves The Addition Of A 2,178 Sf Inspection Space To The Existing Factory Building. Work Includes Foundation, Structural Framing, Roofing, And Necessary Mep (Mechanical, Electrical, And Plumbing) Connections To Integrate With The Existing Facility. The Addition Will Be Constructed To Meet Applicable Building Codes And Operational Requirements.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- Macon, Georgia, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Factory Building Addition
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | This Project Involves The Addition Of A 2,178 Sf Inspection Space To The Existing Factory Building. Work Includes Foundation, Structural Framing, Roofing, And Necessary Mep (Mechanical, Electrical, And Plumbing) Connections To Integrate With The Existing Facility. The Addition Will Be Constructed To Meet Applicable Building Codes And Operational Requirements. |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Macon |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
