Fair Oaks Ranch SAWS Backup Water Supply Project
One of 10,000+ projects Taiyo tracks in Texas.
Source: Community Impact | News
Fair Oaks Ranch is planning a new emergency water service line south of Dietz Elkhorn Road to allow the San Antonio Water System to provide resources during a city utility emergency. The project alignment was revised to be between Fair Oaks Parkway and Leslie Pfeiffer Drive. Approximately 700 feet of 3- and 6-inch lines will be replaced with 12-inch lines capable of delivering about 1,000 gallons
- Status
- Prospective
- Sector
- Power Transmission, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Road, Government
- Location
- Fair Oaks Ranch, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Community Impact | News
ConstructChat
Ask ConstructChat about Fair Oaks Ranch SAWS Backup Water Supply Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Fair Oaks Ranch is planning a new emergency water service line south of Dietz Elkhorn Road to allow the San Antonio Water System to provide resources during a city utility emergency. The project alignment was revised to be between Fair Oaks Parkway and Leslie Pfeiffer Drive. Approximately 700 feet of 3- and 6-inch lines will be replaced with 12-inch lines capable of delivering about 1,000 gallons per minute. The estimated cost is $393,030 with a current budget of $382,340. Construction is planned to start in May and finish in June 2026. |
Original sector | Water Supply |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Fair Oaks Ranch |
Source
Source | Community Impact | News |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT), Road, Government |
Article published date | 2025-12-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in USA
- Town Engineering Expansion
- Stack EFG - Utility Electrical Distribution
- East Campus Parking Deck Transformer Replacement
- Avenir SUA Maintenance Facility
- Alton PCD Amendment
- Repair of High Voltage Switch Box Bases
- Country Club Ranches Water Main Improvements Ph I
- Widen Turnpike SR 91 from Golden Glades Toll Plaza to the Broward County
