Fairburn Station Retail Suite 100 & 150
Sector: Manufacturing (Industrial) • Location: Fairburn, Georgia, United States of America
Source: Dodge USA
This project includes the interior renovation and landlord work for "Black box" of an existing vacant space (suite 100) that is to be sub-divided into two new tenant suites. This drawing set contains scope of work for new suite 100 and a second drawing set for suite 150.The scope of work shown in these design ocuments are not all inclusive. Certificates ofoccupancy are being sought for the black b
- Status
- Closed
- Sector
- Manufacturing (Industrial), Residential, Commercial
- Location
- Fairburn, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fairburn Station Retail Suite 100 & 150
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes the interior renovation and landlord work for "Black box" of an existing vacant space (suite 100) that is to be sub-divided into two new tenant suites. This drawing set contains scope of work for new suite 100 and a second drawing set for suite 150.The scope of work shown in these design ocuments are not all inclusive. Certificates ofoccupancy are being sought for the black box space. The interior tenant build-out scope ofwork will be issued as part of a separate interio... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Fairburn |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Residential, Commercial |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
