Fairdale & Michaels - Utility & Roadway Improvements
Sector: Water Supply and Storage • Location: Lakemore, Ohio, United States of America
Source: Dodge USA
A general description of the work is as follows: Install approximately 2,123 LF of 6" PVCwater main. Install approximately 2,002 LF of cured-in-place sanitary sewer pipe lining. Install 520 LF of new 8" sanitary sewer. Install cured-in-place sewer lateral rehabilitation for approximately 39 sewer laterals. Rehabilitate 8 sanitary manholes and install 4 new sanitary manholes. Install new drive culv
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Bid Results |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | A general description of the work is as follows: Install approximately 2,123 LF of 6" PVCwater main. Install approximately 2,002 LF of cured-in-place sanitary sewer pipe lining. Install 520 LF of new 8" sanitary sewer. Install cured-in-place sewer lateral rehabilitation for approximately 39 sewer laterals. Rehabilitate 8 sanitary manholes and install 4 new sanitary manholes. Install new drive culverts, storm sewer, and 7 new catch basins. 2, 174 LF of full depth and full width roadway replace... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
