Fairgrounds Road Utility Improvements & Resurfacing
One of 10,000+ projects Taiyo tracks in Ohio.
Source: Dodge USA
Fairgrounds Road Utility Improvements and Resurfacing 1990301 Clintonville Phase 4 This project consists of installing approximately 5,000 LF of waterline and water services; approximately 825 LF of sanitary sewer main; sanitary laterals; 1,860 LF of storm sewer; milling and resurfacing of Fairgrounds Road; CCTV of completed storm and sanitary lines; and As-Built Drawings as indicated in the drawi
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Power Transmission, Road, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Mount Vernon, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Fairgrounds Road Utility Improvements & Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Fairgrounds Road Utility Improvements and Resurfacing 1990301 Clintonville Phase 4 This project consists of installing approximately 5,000 LF of waterline and water services; approximately 825 LF of sanitary sewer main; sanitary laterals; 1,860 LF of storm sewer; milling and resurfacing of Fairgrounds Road; CCTV of completed storm and sanitary lines; and As-Built Drawings as indicated in the drawings and specifications. Questions regarding the work should be directed to the City Engineer at 7... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Mount Vernon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Power Transmission, Road, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
