logo
ProjectGc Bidding

Fairhaven Raw Water Well Replacement REBID

One of 10,000+ projects Taiyo tracks in Mississippi.

Source: Dodge USA

The project consists generally of the construction of one 1,000 gallon per minute raw groundwater supply well adjacent to an existing water treatment facility, including all drilling, test well development, raw water analysis, reaming, casings, screen, gravel wall, well development, well testing, well cleaning, CCTV inspection, construction of pump foundation, well pump, discharge head, column ass

Status
Under Construction
Sector
Power Generation (CCGT), Government, Water Supply and Storage, Waste Processing and Treatment, Commercial
Location
Olive Branch, Mississippi, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Fairhaven Raw Water Well Replacement REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Fairhaven Raw Water Well Replacement REBID” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Olive Branch, Mississippi, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

GC Bidding

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists generally of the construction of one 1,000 gallon per minute raw groundwater supply well adjacent to an existing water treatment facility, including all drilling, test well development, raw water analysis, reaming, casings, screen, gravel wall, well development, well testing, well cleaning, CCTV inspection, construction of pump foundation, well pump, discharge head, column assembly, shafts, suction pipe, electric motor, water level indicator, pressure gauge, discharge pip...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Mississippi

City

Olive Branch

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government, Water Supply and Storage, Waste Processing and Treatment, Commercial

Article published date

2024-10-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project